Work

Proof on the ground.

Scope and schedule are set after a site visit and a written proposal. Each card pairs a photo with a plain-language note about what is in the frame.

Wood-chip equipment at a residential curb with blue tarps on the lawn and evergreen trees.

Surrey, BC · 2026-03

Surrey, BC — large-property cleanup

Chip truck at the curb, tarps on the lawn—typical setup when we clear heavy brush and protect turf at the same time.

Duration
Usually several days on this scale
Full narrative+

The photo shows mobilization: chip line, equipment, and lawn protection while trees and evergreens frame the lot. We run large cleanups on properties like this across the region; your scope, haul-off plan, and calendar are spelled out after we walk the site.

Curved segmental retaining walls on a residential slope with dark mulch and new planting.

Vancouver, BC · 2026-02

Vancouver, BC — terraced retaining walls

Curved segmental walls stepping the grade, with mulched planting shelves—retaining work, not a driveway surface.

Duration
Depends on wall height and access
Full narrative+

Segmental units follow the slope with mulch and young planting in the tiers. We build similar walls and terraces where grade needs to be held; engineering and finishes follow your property and municipality.

Paver patio with stone seat wall, chairs, and warm exterior lights on evergreen planting at dusk.

White Rock, BC · 2025-11

White Rock, BC — patio and seat wall

Paver patio, low stone seat wall, outdoor lighting, and evergreens—hardscape and lighting finished before planting fills in.

Duration
Often two to four weeks for a similar footprint
Full narrative+

You are looking at paving, a capped seat wall, and low wash lighting on conifers. This is the kind of outdoor room we design and build; planting, irrigation, and furniture layout are detailed in your contract package.

Mulched garden slope with flat stone steppers and round lawn stepping stones beside shrubs.

Burnaby, BC · 2025-09

Burnaby, BC — path on a mulched slope

Mulch, flat stone steppers, and lawn steppers for a clear path through a sloped bed—garden circulation, not a drain trench.

Duration
A few days to two weeks, by scope
Full narrative+

The photo is finish work on the walking surface: mulch, stone steppers, and round steppers in the lawn. Drainage jobs start with how water actually moves on your lot; this image simply shows the kind of tidy path work we pair with grade changes.

Technician on a ladder washing house siding above mortared stone wainscot and foundation plantings.

Langley, BC · 2025-08

Langley, BC — residential siding wash

Ladder work on upper siding with stone wainscot below—controlled pressure and masking where plantings sit close to the wall.

Duration
Often one to three days
Full narrative+

We wash mixed materials so water, chemistry, and overspray stay controlled. Commercial and residential washes are scoped the same way: substrate first, then pressure and product, then rinse—confirmed before we book the crew.

Garden bed layout with curved metal edging, layout strings, tools, and wheelbarrows on dark soil beside lawn.

North Vancouver, BC · 2025-06

North Vancouver, BC — steel bed edging

Steel landscape edging, fresh soil, and string lines—bed layout before mulch and plants go in.

Duration
About one to two weeks for bed work of this scale
Full narrative+

Curved steel edging and soil prep give clean bed lines on wet Coast sites. The photo is mid-build; topdress, plants, and irrigation follow the plan we agree with you.

Call nowBook site visit